The Brief:
The Client wanted a multiplay unit for the school grounds which could be used by multiple users but offered challenge through play. The area was to be surfaced with a suitable material to make the area safe.
Equipment Installed:
• WD 1410 Timber Multiplay
• Wet pour safety surfacing
The Challenges:
The installation took place during school holidays to minimise risk to the students. The project was completed on time and to budget.
Outcome:
The new unit has already provided hours of play for children at the school. The three platforms offer loads of space for multiple users, along with challenge on the climb wall, fireman’s pole, rope bridge and climb net, plus many more fantastic features.