The brief:

Bocketts Farm were in need of a complete playground makeover
that fitted in with the beautiful farm landscape. The existing
play area was just under 1300m2 in size, and was required to
accommodate over 150 kids from 2 years upwards.

Equipment installed:

Our aluminium play range was predominantly used throughout
the scheme to lower customer maintenance requirements and
no risk of rust to product. Surfacing used was colour TPV.

The panels on this play range are made from HPL (high
pressure laminate) which is constructed with recycled paper.
All existing bark was excavated but reused on site, so it did
not go to landfill.

The challenges:

During the installation, we were battling with incredibly
difficult weather throughout the 3 months on site. In spite
of these conditions, we still managed to complete on time
(November 2023).

Outcome:

A happy client!
“The feedback from our visitors since the installation
of the new playground has been nothing but positive.
Children will spend hours exploring the whole area,
much to the delight of parents! We are thrilled with
how it has transformed the space.”