Project Details | |
---|---|
CLIENT | Prestbury Parish Council |
BUDGET | £163,200,00 + VAT |
DATE | 2022 |
PROJECT TYPE | MUGA and Gym |
The Brief:
The Client were looking for a new MUGA sports zone for a
range of sporting activities, available to be hired out to local
groups. A Daily Mile track was also required around the field
alongside a new outdoor gym space.
Equipment Installed:
• Championship Fencing
• Floodlighting
• Velour Multi-Sport Grass
• Markings for 5-a-side
• Markings for tennis
• Markings for Netball
• SUDS Pathway
• Multi active wall with maths leap and team knock out panels
• 700m2 SUDS Daily Mile Track
• Chest Press/Lat Pull Gym
• Exercise Bars
• Rowing Machine
• Cross Rider
The Challenges:
The installation took p lace in a community p ark so HERAS
fencing was secured around all sites during installation and
surfacing. A plant store was also present to store all tools
overnight.
Outcome:
The playing fields now have a fun and exciting sports space
on site. With a MUGA with floodlighting which can be hired
by local groups and teams. A multi-active goal end allows free
play for any users alongside the MUGA.
The gym has four units with six user stations offering a range
of cardiovascular and strength-based equipment on SUDS
bond surfacing which is perfect for year-round fast drainage.
The SUDS daily mile track has 700m2 of running space around
the field, offering a sturdy, minimal slip surface for all users
to enjoy.
The site has been a huge success with the local community
and is perfect for outdoor fitness all year round.